Fanjooyan
Fanjooyan Pars Niroo Engineering Co is a reputable pioneer Iranian company highly experienced in oil and gas industry as well as development of water resources with many qualified staff active in industrial water production and potable water production domain in southern coasts of Iran, also it was establish for treatment of municipal and industrial waste water; thanks Lord for valuable capabilities for self-sufficiency and independency to foreign countries in this regard.  
Thanks to Blessing almighty God and young qualified experts who creatively and efficiently had the company capably achieve in oil, gas and water industries.
Controlling and monitoring of two MED-2000 m3/day water desalination system in Qeshm.
  • Capacity of MED-2000 m3/day × 2 water desalination system
  • Employer: Iranian Offshore Oil Company
  • Project site: Qeshm Island
  • Began: 2008 
  • Ended: 2009
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Controlling and monitoring of m3/day MED-2100 water desalination system in Lavan.
  • Capacity of MED-2100 m3/day water desalination system
  • Employer: Oil Refining Company
  • Project site: Lavan Island
  • Began: 2008 
  • Ended: 2009
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Controlling and monitoring of m3/day MED-2400 water desalination system in Lavan.
  • Capacity of MED-2400 m3/day water desalination system
  • Employer: Iranian Continental Shelf Oil Co
  • Project site: Lavan Island
  • Began: 2010 
  • Ended: 2011
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
 
Controlling and monitoring of two MED 2000 m3/day
  • Capacity of MED-2000 m3/day water desalination system
  • Employer: Iranian Continental Shelf Oil Co
  • Project site: Qeshm Island
  • Began: 2010 
  • Ended: 2011
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC

 

Execution of m3/day MED-2400 sea water line of Bandar Abbas power plant
  • water desalination systems tank capacity: MED-2400 m3/day
  • Employer: Hormozgan Regional Electric Company
  • Project site: Plant Bandar Abbas
  • Began: 2009
  • Ended: 2011

 

Foundation execution and installation of structure , walk way, hand wheal , 3desalination systems as well.
  • water desalination systems tank capacity: MED-4000 m3/day
  • Employer: Persian Gulf Star Oil Company
  • Project site: Bandarabbas
  • Began: 2009
  • Ended: continue
 
Installing, operating and utilizing a m3/day MED-360 desalination water in Khark.
  • water desalination systems tank capacity: MED-360 m3/day
  • Employer: Iranian Offshore Oil Company
  • Project site: Khark Island
  • Began: 2007
  • Ended: 2008
 
Handling, repair , installation and operation of two MED-1500 m3/MED-2000 m3/day water desalination systems.
  • water desalination systems tank capacity: MED-1500 m3/day MED-2000 m3/day
  • Employer: Persian Gulf Star Oil Company
  • Project site: Bandarabbas
  • Began: 2007
  • Ended: 2008
 
Substantial repairs and optimization of two m3/day MED-1200 water desalination systems in Lavan.
  • water desalination systems tank capacity: MED-1200 m3/day
  • Employer: Iranian Offshore Oil Company
  • Project site: Lavan Island
  • Began: 2007
  • Ended: 2007

 

Installed3 MED 4000 m3/day water desalination systems.
  • water desalination systems tank capacity: MED 4000 m3/day
  • Employer: Persian Gulf Star Oil Company
  • Project site: -
  • Began: 2009
  • Ended: 2011

 