Fanjooyan Pars Niroo Engineering Co is a reputable pioneer Iranian company highly experienced in oil and gas industry as well as development of water resources with many qualified staff active in industrial water production and potable water production domain in southern coasts of Iran, also it was establish for treatment of municipal and industrial waste water; thanks Lord for valuable capabilities for self-sufficiency and independency to foreign countries in this regard.  
Thanks to Blessing almighty God and young qualified experts who creatively and efficiently had the company capably achieve in oil, gas and water industries.
Controlling and monitoring of m3/day MED-1200 water desalination system in Lavan.
  • Capacity of MED-1200 m3/day water desalination system
  • Employer: Iranian Offshore Oil Company
  • Project site: Lavan Island
  • Began: 2010 
  • Ended: 2011
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Controlling and monitoring of m3/day MED-2000 water desalination system in Bandar Abbas.
  • Capacity of MED-2000 m3/day water desalination system
  • Employer: Persian Gulf Star Oil Company
  • Project site: Bandar Abbas
  • Began: 2008 
  • Ended: 2009
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Controlling and monitoring of m3/day MED-2400 water desalination system in Lavan.
  • Capacity of MED-2400 m3/day water desalination system
  • Employer: Iranian Continental Shelf Oil Co
  • Project site: Lavan Island
  • Began: 2010 
  • Ended: 2011
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
 
Procurement and construction of flow line for BL-13 well of Balal Oil Rig
  • Employer: Iranian Offshore Oil Company
  • Project site: Corn oil rig Lavan Island
  • Began: 2010
  • Ended: 2010

 

Optimization , procurement and replacement of all tubes of phase 2 and 3 m3/day MED-1300 desalination system.
  • water desalination systems tank capacity: MED-1300 m3/day
  • Employer: South Pars Gas Complex Company
  • Project site: South Pars phases 2 and 3
  • Began: 2009
  • Ended: 2009
 
Operating 3 m3/day MED-1718 water desalination systems for phase 9 and 10.
  • water desalination systems tank capacity: MED-1718 m3/day
  • Employer: South Pars Oil and Gas Company
  • Project site: South Pars phases 9 and 10
  • Began: 2008
  • Ended: 2008
 
Optimization and essential repairs of two m3/day MED-2100 water desalination systems in Lavan
  • water desalination systems tank capacity: MED-2100 m3/day
  • Employer: Lavan Oil Refining Company
  • Project site: Lavan Island
  • Began: 2007
  • Ended: 2007
Design, and production of 5000m3 reservoir in Qeshm for Fan Niroo Co.
  • water desalination systems tank capacity: 5000 m3
  • Employer: Iranian Offshore Oil Company
  • Project site: Qeshm Island
  • Began: 2009
  • Ended: 2010

 

Installed3 MED 4000 m3/day water desalination systems.
  • water desalination systems tank capacity: MED 4000 m3/day
  • Employer: Persian Gulf Star Oil Company
  • Project site: -
  • Began: 2009
  • Ended: 2011

 

Produced 8 high pressure water desalination tanks.
  • Making partner: Petro Avan
  • Employer: National Oil Corporation of South
  • Project site: Ahvaz
  • Began: 2007
  • Ended: 2007

 