Fanjooyan Pars Niroo Engineering Co is a reputable pioneer Iranian company highly experienced in oil and gas industry as well as development of water resources with many qualified staff active in industrial water production and potable water production domain in southern coasts of Iran, also it was establish for treatment of municipal and industrial waste water; thanks Lord for valuable capabilities for self-sufficiency and independency to foreign countries in this regard.  
Thanks to Blessing almighty God and young qualified experts who creatively and efficiently had the company capably achieve in oil, gas and water industries.
Controlling and monitoring of two MED-2000 m3/day water desalination system in Qeshm.
  • Capacity of MED-2000 m3/day × 2 water desalination system
  • Employer: Iranian Offshore Oil Company
  • Project site: Qeshm Island
  • Began: 2008 
  • Ended: 2009
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Controlling and monitoring of m3/day MED-2100 water desalination system in Lavan.
  • Capacity of MED-2100 m3/day water desalination system
  • Employer: Oil Refining Company
  • Project site: Lavan Island
  • Began: 2008 
  • Ended: 2009
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
Handling of MCC boards, optimization, design and monitoring of two MED-1200 m3/day water desalination systems.
  • Capacity of MED-1200 m3/day water desalination system
  • Employer: Iranian Continental Shelf Oil Co
  • Project site: Lavan Island
  • Began: 2010 
  • Ended: 2011
  • Delivered services:
  • Design and development of UCP panel
  • Purchase and programming of PLC Siemens S7-300
  • Design and set up of HMI software based on Simatic Win CC
 
Two m3/day MED-2000 desalination systems are installed and operating in Qeshm
  • water desalination systems tank capacity: MED-2000 m3/day
  • Employer: Offshore Oil Company Qeshm
  • Project site: Qeshm Island
  • Began: 2009
  • Ended: 2010
 
Procurement and construction of flow line for BL-13 well of Balal Oil Rig
  • Employer: Iranian Offshore Oil Company
  • Project site: Corn oil rig Lavan Island
  • Began: 2010
  • Ended: 2010

 

Foundation execution and installation of structure , walk way, hand wheal , 3desalination systems as well.
  • water desalination systems tank capacity: MED-4000 m3/day
  • Employer: Persian Gulf Star Oil Company
  • Project site: Bandarabbas
  • Began: 2009
  • Ended: continue
 
Installing, operating and utilizing a m3/day MED-360 desalination water in Khark.
  • water desalination systems tank capacity: MED-360 m3/day
  • Employer: Iranian Offshore Oil Company
  • Project site: Khark Island
  • Began: 2007
  • Ended: 2008
 
Substantial repairs and optimization of a m3/day MED-1200 water desalination system in Siri.
  • water desalination systems tank capacity: MED-1200 m3/day
  • Employer: Iranian Offshore Oil Company
  • Project site: Siri Island
  • Began: 2007
  • Ended: 2007

 

Optimization and essential repairs of two m3/day MED-2100 water desalination systems in Lavan
  • water desalination systems tank capacity: MED-2100 m3/day
  • Employer: Lavan Oil Refining Company
  • Project site: Lavan Island
  • Began: 2007
  • Ended: 2007
Design, and production of 5000m3 reservoir in Qeshm for Fan Niroo Co.
  • water desalination systems tank capacity: 5000 m3
  • Employer: Iranian Offshore Oil Company
  • Project site: Qeshm Island
  • Began: 2009
  • Ended: 2010

 